Installation From Basin to Discharge
Installation begins by calculating the wastewater demand, vertical lift, discharge distance, and pipe size. A sealed basin is positioned below the fixtures it serves. The pump, inlet, vent, discharge line, check valve, shutoff valve, electrical connection, and optional high-water alarm are then installed.
The basin must be properly sealed and vented to prevent sewer gases from entering the building. Once connected, the system is filled and tested to confirm that the float activates correctly, the discharge line holds pressure, and the pump shuts off at the proper level. Manufacturer installation instructions also require correct sizing and system configuration for dependable operation.